Slurry Transfer Services
Integrated dredging, slurry pumping, sludge separation, and dewatering service calculated by cost per m³ solid.
Slurry Transfer Services
Limeda delivers an end-to-end solution for sludge dredging, slurry pumping, pipeline transfer, and dewatering. Our efficient dewatering systems separate slurry into filter cake and recovered water, providing a safe, reliable, and cost-effective solution for mining and industrial applications.


Engineered Solutions for Mud, Sediment, and Slurry Handling
Many industrial and mining sites face challenges caused by the accumulation of mud and sediment, reducing pond capacity, disrupting production processes, limiting operational areas, and affecting water management systems. High-solids slurry requires properly engineered pump selection, pipeline design, and separation systems to ensure safe, reliable, and cost-efficient material transfer.
Sedimentation ponds filled with accumulated mud and sediment
Slurry materials cannot be efficiently transferred using conventional pumps
High solids content leads to clogging, excessive wear, and abrasion
The cost of trucking wet sludge is excessively high
Work sites require effective separation of slurry into dewatered cake and reusable water
Temporary or project-based solutions are needed without the capital investment of purchasing large equipment


End-to-End Slurry Transfer Solution
Limeda delivers an end-to-end solution for sludge dredging, slurry pumping, pipeline transfer, and dewatering. Our efficient dewatering systems separate slurry into filter cake and recovered water, providing a safe, reliable, and cost-effective solution for mining and industrial applications.
Removal of sediment, sludge, slurry, tailings, and accumulated deposits from ponds, sumps, pits, lagoons, canals, and other containment areas to restore capacity and improve operational efficiency.
Slurry Dredging
Safe and efficient slurry transportation using pumping systems engineered to match the material characteristics, duty point, transfer distance, total dynamic head, solids concentration, and site operating conditions.
Slurry Pumping & Transfer
Pipeline & Discharge Management
Design and deployment of temporary or semi-permanent pipeline systems to ensure stable slurry flow, safe operation, and minimal downtime throughout the transfer process.
Separation of sludge into dewatered cake and clarified water to reduce disposal volume, simplify material handling, lower transportation costs, and maximize water recovery for reuse.
Sludge Dewatering & Separation
What We Deliver
Process Flow
→
→
→
→
→
The Limeda team conducts a comprehensive assessment of the slurry conditions, duty point, material volume, transfer distance, disposal area, and target output before determining the most suitable pump configuration, dredging system, pipeline, and dewatering unit for the application.
Scope of Work
Site survey and technical assessment
Slurry sampling and material characterization
Flow rate, head, SG, solids content, and transfer distance calculations
Selection of the appropriate slurry pump and dredging equipment
Installation of temporary pipelines and discharge systems
On-site slurry transfer operations
Dewatering of slurry into filter cake and separated water
System performance monitoring throughout the project
Preventive maintenance during project execution
Equipment demobilization upon project completion
Application Areas
Settling Pond Cleaning
Sludge Pond Dredging
Mine Pit Sediment Removal
Tailings Pond Slurry Transfer
Coal Preparation Plant Sediment Handling
Industrial Wastewater Sludge Removal
River Port & Jetty Sediment Management
Process Pond Maintenance
Lagoon & Basin Cleaning